Friday, October 31, 2008

Woodstove

It's set except for the chimney, which i ordered weeks ago but has yet to arrive. And it's COLD.

Thursday, October 30, 2008

Plumbing

i extended the sewer line into the house.

Saturday, October 25, 2008

Firewood

Filled ex-hovel and toolshed with fuel.

Thursday, October 23, 2008

3rd Level Walls: Deck Wall

Glass & sliding glass along the deck.

Wednesday, October 22, 2008

3rd Level Walls: Deck Wall

Framed top of deck wall.

Thursday, October 16, 2008

Roof: Complete!


STILL TO DO, SOON: woodstove & chimney, 1 more wall (the one out onto the deck), some framing details (which i skipped to speed progress toward the roof), winterizing water & sewer lines, a few more windows, corner trim, exterior doors, & stockpile materials & supplies for winter (the site is a 0.7-mi ski from where the snowplow stops). LATER: insulation, ceiling, wallboard, stairs, plumbing, electric (required by BuldingDept even tho' i'll have no power), etc. (And, oh yeah, make some $$; i'm broke!)

Friday, October 10, 2008

Roof: Gable Trim Complete

...but still needs a ridge cap.

Thursday, October 09, 2008

Roof: Gable Trim

The blue looks really nice against the redwood stain. Alas, the house is so high that one has to climb practically to Gibson Peak to see its roof.

Wednesday, October 08, 2008

Roof: Final Siding (except porches)

Less & less of that awful green house-wrap.

Rob & Larry wrassled sheet rock & insulation (to be installed this winter) up to upper levels.

(those 2 piles of insulation cost over $1k!)

Tuesday, October 07, 2008

Roof: Panels Complete


...but still needs cap & trim.

Monday, October 06, 2008

Roof: 'Tahoe Blue'

Hoisting the panels:

Roof-top anchor for the cable:

Roof!

View of distant 14,000' MtShasta from the roof:

Sunday, October 05, 2008

Roof Deck: Underlayment Complete

Saturday, October 04, 2008

Roof Deck: Toward Keeping Out the Rain

All ply done...

...& half the felt.

Friday, October 03, 2008

Roof Deck: More Roof, More Rain

POURED rain all day. Rob helped apply the almost-last of the plywood. We got soaked!

Tho the plywood is on, there's required spacing between the sheets, so all the wet dribbles down to levels below.

Thursday, October 02, 2008

Roof Deck: Rain!

Yuk!

But the metal roofing has arrived!

Wednesday, October 01, 2008

Roof Deck: & More Ply

Looking 1 way...

& the other: